With the release of FieldLink v6.3 the workflow for creating and managing files has changed. You will no longer being creating a Job file inside of FieldLink that stores the project point and scan data. Now you will create a Project that will not only store point and scan data it will also be the parent data folder for the managing of Models and PDF files that are used as your project background. The new version of FieldLink creates what is called a TFLX file that is the data folder where you will upload and manage point and scan data files.
Below is a video and a detailed list of steps that need to be followed to create a Project in v6.3 plus the steps show you how to import point, scan and background model files.
How-To-Video
Step-by-Step
Projects
Select the More button Then select Projects in the list
Manage
Select Manage
Create New
Select Create New
Type the project Name
Type a Description for the project (this is an optional entry field)
If you want to add an image to the project you can do that by clicking on the folder as shown below:
Tap the Create button to create the Project
Add Models/Drawings/Plans
Add your Model file. Multiple models (trb), PDFs, dwgs, files can be managed in the Project.
Add Point Data
If you are going to be using the Project to do layout or collect as-built point data then you will need to create a TFLX file that your point data can be saved to
You can import your point data (CSV, TXT, TFLX) using the import button as shown below. Multiple point files can be created or imported and managed in the Project.
Add Scan Data (Scanning Only)
If you are going to using the Project to collect scan data then you will need to create a TFLX file that will allow for the saving of the scan data to the project
You can import a scan file to the project using the import button as shown below. Multiple scan files can be created or imported and managed in the Project.
Open
Tap the Open button and that will take you to the Map view
To see and manage the data files included in the Project and used in the Map view you will need to select the Model Tree button on the left side of the screen as shown below:
Notes:You can import data created from previous versions of FieldLink but those TFL files will need to be converted to a TFLX file before they will work in version 6.3
TFL: "Import Failed - Invalid Data File Format" Problem: When importing a CSV/TXT file the user gets an error stating "IMPORT FAILED - INVALID DATA FILE FORMAT" Solution: This is caused by the format of the point file being incorrect. The point file ...
FieldLink: Data Transfer via Trimble Connect You can access your project data inside of FieldLink via Trimble Connect as long as you using version 6.0 or higher. See the videos below for other options to access Trimble Connect on your FieldLink ...
FieldLink: Align and Move Need to move a model/plan to align to another model? Watch this video to learn how: Video Steps Outlined Create a New job Create a new job for your project inside of FieldLink Log in to Trimble Connect Log in to Trimble ...
FieldLink: v6.6 Release Notes FieldLink v6.6 (2023-02 v6.6.0) has been released and ready to install via Trimble Installation Manager (TIM). Please see the support article about installing updates via TIM if you need help updating FieldLink. Please ...
FieldLink: v6.5 Release Notes FieldLink v6.5 (2022-10 v6.5.0) has been released and ready to install via Trimble Installation Manager (TIM). Please see the support article about installing updates via TIM if you need help updating FieldLink. Please ...